Let's face it - summer is busy. We are building, sailing, growing vegetables, swimming, and trying to get as much sun as possible during the short summer months. The blogs seems to slide down the priority list - but now fall is here and we are busy watching the leaves fall, the squirrels are busy, the dog got sprayed by a skunk, and it's time to catch up.

Air Force 1 is coming together. The exterior is complete, all the wiring and plumbing is roughed in, the walls and ceilings are insulated and the pine boards installed.

IMG_0692.JPG
IMG_0697.JPG

The floor went down. and the interior cabinetry is taking shape. There are walnut counter tops under construction, and there is a guest bed that will slide under the raised floor. A cool movable couch that will contain dining room chairs is in the planning stage ( 3am inspiration is coming!).

IMG_0675.JPG
IMG_0707.JPG
IMG_0679.JPG

The cat likes to hide under the trailer and then leap out at the unsuspecting.

IMG_0693.jpg

We had our winter build lined up, and then the client had toback out - so hopefully one of the others will step in. But if you have a design ready to go we have a rare opening in our schedule and you should call James right now on 902 277 0862.

Happy Canadian Thanksgiving to all our friends, clients, and anyone who follows our adventures.

 

Posted
AuthorFull Moon