Phase One is complete - this means the roof is on, the windows are in, the door is installed, and the exterior trim and siding is complete. Now we move inside - where the electrical wiring has been roughed in, and the plumbers are roughing in the pipes and tanks. Then we will start insulating and getting the walls and ceiling prepped for installation. The exterior looks great - the colour combination of the blue and white is very crisp looking.

IMG_0619.jpeg
IMG_0622.jpeg
IMG_0623.jpeg
IMG_0626.jpeg
Posted
AuthorFull Moon